With temperatures soaring into the late twenties, work has continued on the external walls with three sides of the Sports Hall now ready to receive doors and windows. Internal footings have been dug for the internals walls for changing rooms, toilets and games rooms.  Cabling for the fire alarm and lighting in the main gym area has been installed while the cherry picker is on site. We are now waiting for another load of blocks which are due to arrive on Tuesday. Final quotes for windows and doors are coming in and hopefully we can order them by the end of next week.